1. Pre-Startup Inspections
Confirm that the power supply, steam (5-10 kg/cm²), water pressure (1-2 kg/cm²), and air pressure (7-9 kg/cm²) are normal.
Check the nozzle gap for uniformity to avoid uneven fabric speed and dyeing.
Clean the dye vat and filter to ensure there are no residual dye or debris.
2. Programming and Parameter Settings
Use the control panel to set the process curve, including the heating rate (e.g., 2°C/min), target temperature (e.g., 60°C), and hold time.
Multiple process curves can be stored, each with 40-100 steps.
Typical program example: Fill water to mid-water level → Heat to 60°C (hold for 20 minutes) → Start the main pump to circulate dye.
3. Dyeing Process Monitoring
Observe the fabric for smooth circulation to avoid tangles or folds. Temperature control accuracy must reach ±6°C. Overtemperature (>150°C) or thread breakage will trigger an automatic shutdown alarm.
After dyeing is complete, the temperature must be lowered to below 80°C before opening the vat to prevent burns.